Awasi School

Stairwell Almost Completed
Stairwell in Progress
Outside Stairwell Construction in Progress
Outside Balcony
Enclosing the Stairwell
Stairwell Construction Underway
Plastering the Balcony
Windows Being Installed
Glass Installation
Finishing Up Window Installation
Interior Painting Progress
Interior Painting Completed
Interior Painting Panoramic
Exterior Painting Progress
Exterior Painting Being Completed
Exterior Plaster Done December 2022
Plastering Outside Walls of School
Restroom Tile in Progress
Plaster in Progress
Restroom Stalls Tile Going In
Looking at the Progress
Restroom Tile in Progress
Restroom Tile Installed
Restroom Tile
Tile Installed in Bathroom
Kitchen Tile
Kitchen Tile Installed January 2023
Kitchen in Progress
Kitchen Tile Almost Done
Floor Progress
Floor Going In
Exterior School Progress
Exterior Progress
Exterior Plaster
Exterior Plaster Progress
Hallway Floors Being Plastered
Erin mixing the plaster for the walls of the school
Kenyan school progress of 1st and 2nd floor
Construction of the bathrooms of the Awasi school
Construction of the outside staircase of the school underway
Workers plastering the walls of the school
Kenyan construction workers with volunteer Josh and our Kenyan liaison Dr. Bonyo
Outside plaster completed on the Awasi school
Inside plastering of the walls of the Awasi school
Outside progress of the Awasi school
Kenyan construction worker eating lunch
Workers preparing to start digging by spray painting the outline of the school on the ground
Workers hand digging the ground to create the foundation of the school
Workers laying the foundation of the school
Construction of the foundation of the Awasi school
The beams for the ground floor of the Awasi school are up
Kenyan children standing in front of the completed ground floor of LINC's Awasi school
Workers building the school's ground floor walls by laying bricks
Erin breaking ground for the school's foundation
Scaffolding for staircase construction at Awasi school
Workers halfway done with laying bricks for a school wall
Walls of the school's ground floor halfway done
Workers aligning beams to create the school roof
Workers connecting roof beams before adding the final layers
Erin and Kenyan children holding a shovel to break ground for our Awasi School Project
Close-up of worker's hands laying first row of bricks for the school
Halfway done with covering the roof of the Awasi school
Workers hand digging the school's foundation
Our contractor standing on the second floor of the Awasi School
Workers finishing the roof construction of our Awasi, Kenya school
Dump truck dropping off materials to help finish top slab construction
Erin talking with a Kenyan contractor at Awasi School work site
LINC Volunteers helping Kenyan workers build the second floor of our Awasi School
Above view of the wall plate for first floor Awasi school
Kenyan man laying row of bricks for the Awasi school
Worker hand digging hole for septic tank
Kenyan worker building school walls by laying bricks
Many Kenyan workers laying bricks for the Awasi School Project
Erin and Kenyan contractor standing on the second floor of the Awasi school
Kenyan workers using measuring tape to plan construction of the Awasi School Project
A truck dropping off long beams of wood for the school construction
Erin and Dr. Bonyo posing outside the ground floor of the school
Kenyan workers almost done laying bricks for a ground floor wall
Worker standing next to a window frame he finished making
Finished window frame with the shutters open
Worker placing metal pieces together to build a window frame
Several finished window frames leaned up against each other
Worker welding a window frame for the school
Finished window frame with the shutters open
Finished door frame with door attached
Worker painting one of the door frames
Stack of almost finished window frames for the school
Several doors leaned up against each other almost finished for the school
Electrical cords placed in wall ready for light fixtures
Electrical wiring installed for hooking up light fixtures
Electrical cords installed for light fixtures
Water tanks installed to catch rain water